JDH Mercury Header
Open 24/7 · Serving MD & VA MHIC #137491 · VA #2705192986 4.9★ (1,400+ Reviews) Google Verified
4.9★ (1,400+) · Google Verified · MHIC #137491
Mercury Export — Roof Replacement Process
Roof Replacement Process
PROCESS

Roof Replacement Process: What to Expect

Jim Dodson
By Jim Dodson, Operations Manager Updated May 7, 2026
01 The Answer

JDH Remodeling replaces residential asphalt-shingle roofs in Southern Maryland and Northern Virginia in a single day for most homes up to 20 squares, using a 4-to-8-person crew led by Roofing Foreman Jesus Luna under Production Manager Steve Dean's daily oversight, with every step documented in CompanyCam from free inspection through warranty registration.

Summarize This Page with AI:
JDH's roof replacement runs in three phases. BEFORE: Brian McClees or a Senior Inspector conducts a free 60-to-90-minute forensic inspection using the PCC Method. Production Manager Steve Dean orders materials through SRS Distribution, which delivers and roof-loads the day before install. DURING: Jesus Luna's crew of 4 to 8 roofers arrives at 8 AM, completes tear-off in 2 to 3 hours, installs underlayment and drip edge before lunch, and finishes Owens Corning Duration shingles by 4 to 6 PM. AFTER: A rolling magnetic sweeper collects all nails, gutters are cleared, driveways are blown clean, and Steve Dean conducts a final walkthrough before the crew departs. Owens Corning Platinum Protection warranty is registered on your behalf. Contract to completion: 7 to 14 days for scheduling, 1 day on-site for most homes.

Quick Price Guide

$0 down financing

No deposit when financed through approved providers. Free forensic inspection with photo documentation, no obligation.

Get a free inspection
WHAT TO EXPECT

The 5-Step Process

1
BEFORE · 60-90 minutes on-site

Free Forensic Inspection and Estimate

Brian McClees or a JDH Senior Inspector (Joey Walzel, Matt Brown, Sam Carts, or Tom Raley) conducts a free on-roof forensic inspection using the PCC Method, running 60 to 90 minutes with thermal imaging, GoPro video, and a full photo catalog emailed before leaving your property.

The inspection is free for homeowners. Every inspector physically walks the roof. Ground-only or drone-only inspections are not used as a substitute. The PCC Method documents Problem, Cause, and Consequence for every finding. The attic is checked for ventilation balance, decking integrity, and insulation R-values. You receive the full documentation file by email. The file belongs to you permanently. If repair costs are less than 35% of replacement cost and the repair is a long-term solution, JDH recommends repair, not replacement. No sales quotas. No forced decisions.

Who: Brian McClees, Inspector Manager (HAAG Master Level) + Senior Inspectors Joey Walzel, Matt Brown, Sam Carts, Tom Raley
Your role: Be present for the live one-on-one review before the inspector leaves; receive the photo and video documentation file by email.
Professional inspector conducting roof inspection with drone aerial survey of brick residential home.
2
BEFORE · 7-14 days from contract to install date

Material Selection, Contract, and Permits

Production Manager Steve Dean coordinates material ordering through SRS Distribution, which delivers and roof-loads Owens Corning products the day before installation; a 33% deposit is collected at signing, waived when the job is financed.

Steve Dean has 52 years in the construction industry. He schedules the install date and places the material order after the contract is signed. JDH installs Owens Corning Duration shingles, Deck Defense underlayment, DuraRidge ridge cap, and Owens Corning ventilation systems. You select your shingle color from the Owens Corning Duration line. SRS Distribution delivers and roof-loads materials the day before install. Keep your driveway clear that day. Permits are pulled by JDH when required at a flat fee of $150. Most Maryland and Virginia replacements do not require a permit unless substantial deck replacement is involved.

Who: Steve Dean, Production Manager
Your role: Select shingle color; keep driveway clear the day before install for SRS material delivery.
Aerial view of residential home with active roof replacement showing tear-off and new shingles installation in progress.
3
DURING · 2-3 hours for tear-off; decking inspection concurrent

Tear-Off and Decking Inspection

Jesus Luna and his crew of 4 to 8 roofers arrive at 8 AM, complete tear-off in 2 to 3 hours, and inspect every sheet of decking as it is exposed; 4 replacement sheets are included in every contract, with additional sheets at $85 per sheet after a photo and phone call to the homeowner.

Before work begins, the crew walks the property with the homeowner to document existing conditions. Heavy-duty tarps protect all landscaping. The Catch-All netting system covers bushes and flowers. Dump trailers are staged on the street. Tear-off is complete well before lunch for a typical home. Every exposed decking sheet is inspected. If more than 4 sheets are rotted, Jesus Luna photographs the area and Steve Dean calls the homeowner before any additional decking is replaced. Additional sheets are billed at $85 per sheet. This call happens before the work, every time.

Who: Jesus Luna, Roofing Foreman (32 years in trade) + crew of 4-8
Your role: Plan to work elsewhere if working from home; keep AC and heater off during install; be reachable by phone in case Steve Dean calls about additional decking.
JDH Remodeling crew tearing off old asphalt shingles with dump trailer staged on street in Southern Maryland
4
DURING · Underlayment and drip edge before lunch; shingles through afternoon; crew departs 4-6 PM

Underlayment, Drip Edge, and Shingle Installation

Jesus Luna's crew installs Owens Corning Deck Defense underlayment and drip edge before lunch, then runs Owens Corning Duration shingles with SureNail technology through the afternoon, completing most roofs up to 20 squares the same day.

Ice and water shield is applied at eaves, valleys, and penetrations. Drip edge is set at rakes and eaves. Shingle installation runs through the afternoon. DuraRidge ridge cap is installed at the peak. Owens Corning ventilation components balance intake and exhaust airflow. Steve Dean cycles through all active jobs during the day to verify quality. The Owens Corning Platinum Protection Limited Lifetime Warranty covers materials and labor for 50 years non-prorated, workmanship for 25 years full, and wind up to 130 MPH. The crew departs between 4 PM and 6 PM.

Who: Jesus Luna, Roofing Foreman + crew of 4-8; Steve Dean, Production Manager (quality oversight)
Your role: No action required during installation; be available for the final walkthrough at end of day.
Completed residential home featuring new dark asphalt shingle roof with proper installation and finishing details visible.
5
AFTER · 1-2 hours for cleanup and walkthrough; crew departs 4-6 PM

Cleanup, Final Walkthrough, and Warranty Registration

Jesus Luna's crew runs a rolling magnetic sweeper across all work areas, clears gutters, blows driveways clean, and removes all staging materials; Steve Dean conducts a final walkthrough with the homeowner before the crew departs, and JDH registers the Owens Corning Platinum Protection warranty on your behalf.

The magnetic sweeper collects nails and metal debris from all work areas and surrounding ground. Gutters are cleared of installation debris. Driveways and sidewalks are blown clean. All tarps and dump trailers are removed. The final walkthrough covers roof surface, gutters, ground, and driveway. JDH registers your Owens Corning Platinum Protection warranty at the time of installation. JDH's 5-year workmanship warranty covers all labor and installation-related issues, transferable to one subsequent homeowner. If any concern arises after the job, JDH will have someone on site within 2 business days. The cleanup-and-walkthrough protocol is one of the most frequently cited positives in our customer reviews, alongside our BBB A+ Accredited rating.

Who: Jesus Luna, Roofing Foreman + crew; Steve Dean or project manager for final walkthrough
Your role: Be present for the final walkthrough to confirm the site meets your standards before the crew leaves.
JDH crew member running a rolling magnetic sweeper across a driveway after roof installation to collect nails and metal debris
IF WE FIND ROT

What happens if we find rotted decking

JDH includes 4 sheets of replacement decking in every roof replacement contract at no additional charge. This covers 90% of roofs in Southern Maryland. When tear-off exposes more than 4 rotted or damaged sheets, Jesus Luna photographs the affected area and Steve Dean calls the homeowner the morning of tear-off before any additional decking is replaced. You are never charged for extra decking without a phone call and photo documentation first. Additional sheets beyond the 4 included are billed at $85 per sheet. The inspection process predicts upfront whether additional decking is likely based on the age of the roof, visible soft spots, and attic moisture findings, so most homeowners have a realistic expectation before install day.

Coverage rate
90%
of jobs covered
Sheets included
4
at no extra cost
Per add'l sheet
$85
if more is needed
YOUR PREP CHECKLIST

How to prepare your home

Four things to handle before Jesus Luna's crew arrives at 8 AM. Getting these right keeps your install on schedule and protects your property. SRS Distribution delivers materials the day before, so the driveway timing matters more than most homeowners expect. The noise level during tear-off is significant, and the AC recommendation is a practical one: open roof decking and HVAC systems do not mix well.

  • Keep driveway clear the day prior to install
    SRS Distribution delivers material the day before and roof-loads it directly onto the roof · Day prior to install
  • Plan to work elsewhere if you work from home
    Tear-off and installation are very loud starting at 8 AM · Install day
  • Keep AC and heater off during install
    JDH recommends both systems stay off while the crew is working on the roof · Install day
  • Water bushes and flowers before and after the roof job
    JDH covers all landscaping with the Catch-All netting system, but watering before and after helps plants recover · Before install + after install
Jim Dodson
WRITTEN BY

Jim Dodson

Operations Manager

21+
years in trade

Jim grew up going to construction sites with his father. When he was 18, he decided to take a different path and joined the Elevator Union. He quickly rose through the rank at ThyssenKrupp Elevator. Eventually coming back to the family business in 2016.

Reviewed May 7, 2026
COMMON QUESTIONS

Frequently Asked Questions

How long does a roof replacement take with JDH? +
Most JDH roof replacements are completed in a single day. Jesus Luna's crew of 4 to 8 roofers arrives at 8 AM, completes tear-off in 2 to 3 hours, and finishes shingle installation by 4 to 6 PM for roofs up to 20 squares. Larger homes or steep roofs may require an additional day. From signed contract to crew arrival, most homeowners wait 7 to 14 days.
Do I need to be home during the roof replacement? +
You do not need to be home, but you should plan for significant noise starting at 8 AM. If you work from home, plan to work elsewhere on installation day. JDH documents every step in CompanyCam and Steve Dean is reachable throughout the day. Being available for the final walkthrough at the end of the day is the most useful time to be present.
What happens if rotted decking is found during tear-off? +
JDH includes 4 sheets of replacement decking in every contract at no additional charge, which covers 90% of roofs. If more than 4 sheets are rotted, Jesus Luna photographs the affected area and Steve Dean calls the homeowner the morning of tear-off before any additional decking is replaced. Additional sheets are billed at $85 per sheet. You are never charged without a phone call and photo documentation first.
What warranty comes with a JDH roof replacement? +
JDH registers the Owens Corning Platinum Protection Limited Lifetime Warranty on your behalf at the time of installation. This covers materials and labor for 50 years non-prorated, workmanship for 25 years full and non-prorated, and wind damage up to 130 MPH. It transfers one time to a new homeowner. JDH also backs every installation with a 5-year workmanship warranty on labor and installation.
Does JDH require a deposit, and what financing is available? +
JDH collects a 33% deposit at contract signing. The deposit is waived when the job is financed through an approved provider. JDH works with Foundation Finance, Service Finance, Hearth, and Synchrony. Financing carries no surcharge and no prepayment penalty, with a soft credit pull only. Fixed-rate terms are available from 60 to 120 months.

Ready to Get Started? Free Inspection. No Pressure. One Day.

  • Free forensic inspection with photo documentation
  • No deposit required when you finance
  • 50-year Owens Corning Platinum Protection warranty
  • Crew arrives at 8 AM, most homes done same day
  • Rolling magnetic sweeper cleanup before we leave
(443) 241-7356

JDH Remodeling: serving Maryland and Virginia since 1986. MHIC #137491 · VA Class A #2705192986.

Local Team Direct Line (443) 241-7356

Get Your Free Estimate

By submitting, you agree to be contacted by JDH Remodeling by phone, SMS, and email about your inquiry. Msg frequency varies. Msg & data rates may apply. Reply STOP to opt out of texts, HELP for help. See our Privacy Policy.